Knock down and rebuild of a rotted timber wall, Rochedale South

Rochedale South

Knock down and rebuild of a rotted timber wall, Rochedale South
Project
Wall type
Concrete sleeper
Finish
Whitsunday
Suburb
Rochedale South

Knock down and rebuild of a rotted timber wall, Rochedale South

What was wrong before

An old timber retaining wall ran along the side of this house in Rochedale South and around the back in two tiers. The timber had rotted and the wall was leaning, and when it came out there was no geofabric, ag pipe or drainage gravel behind it. The yard behind it also sat too high, so every time it rained the water ran down the side of the house.

What was done

We knocked the old wall out and rebuilt both tiers in Whitsunday concrete sleepers between galvanised steel posts, over three days. Jake dug the backyard 100 to 150 mm lower so the rain runs away from the house instead of down the side of it. The ground was soft, so Jake used the right auger for the job and the footings went well past the minimum spec for this wall: a 450 mm auger instead of 300 mm, holes 800 mm deep instead of 600 mm, and 32 MPa concrete from the plant instead of 20 MPa. That came to 2.4 cubic metres of concrete where the minimum was 0.8, three times as much.

Jake quotes every wall on this register and builds it. He uses the right auger for the job, 450 millimetres on some walls and 300 millimetres on others, and sets galvanised posts in 32 MPa concrete from the plant, with geofabric, 100 millimetre socked ag pipe and drainage gravel behind the wall.

01

The old wall

Two tiers of timber sleepers, rotted through and leaning in places, with a clothes line on a slab in front. There was nothing behind the timber to drain the water away.

The old timber sleeper tiers along the side of the yard, rotted and leaning, with lawn below them and the outdoor area beyond
The rotted lower timber wall leaning out beside the water tank, with the upper timber tier behind it
02

Getting in

Access was tight. A pool fence panel came off to get the machine through, and the machine's roof came off so it would fit. There was no way in for a concrete truck, so the concrete was pumped. The wall sits close to the house and the water tank, too close for the sleeper grab on the machine, so Jake placed all five tonnes of sleepers by hand.

Both finished tiers seen through the pool fence from under the house, the water tank right beside the new wall
03

Day one: the old wall out

The old sleepers came out and were taken away, and the plants along the line were cleared to make room. Jake also took out the old clothes line and its concrete slab while he was there, at no charge. Then the line was set out with string lines and the pier holes got started.

The old rotted sleepers pulled out onto the lawn beside the excavator, with the clothes line slab in front of them
The side yard with the old wall gone and the line dug along the slope, string lines and blue marking paint on the ground
04

Day two: posts in

The pier holes were drilled with the right auger for the job, 450 mm rather than 300 mm because the ground was soft, and 800 mm deep. The galvanised posts were set and concreted with 32 MPa concrete, pumped in.

The concrete pump hose run across the yard to the excavator with its roof off, galvanised posts laid out along the string line
New galvanised steel posts set in their concrete along the dug line, the excavator beside the house
05

Day three: sleepers, drainage and the yard

The sleepers went in between the posts, with a 100 mm socked ag pipe, geofabric and about five cubic metres of 20 mm drainage gravel behind them. The backyard was dug 100 to 150 mm lower and shaped so the water falls away from the house, and the site was cleaned up.

Whitsunday sleepers in on both tiers with geofabric laid over the gravel behind them, the excavator arm at the right edge
Drainage gravel in the excavator bucket going in behind the geofabric at the back of the new wall
06

Finished

Both tiers done in Whitsunday, a grey stacked stone finish with a dark wash through it, running along the side of the house and around the back.

The new wall running along the side of the house to the back corner, galvanised posts between grey stacked stone sleepers
Rebuilds

Not answered here? Call us on 0488 844 741.

What people ask about replacing a wall

Things worth walking out and looking at: it leans out at the top, sleepers bow between the posts, the ground behind it is dropping, timber is soft at ground level, or water comes out of the face after rain.

A wall that's been leaning for two years will lean for another one, right up until the day it doesn't.

No, we don't do repairs. Once we alter a wall another contractor built, we may become responsible for work we didn't build.

So if your wall is failing, we'll quote a knock down and rebuild.

The ones we replace nearly always come down to the same three things: no drainage, hand mixed concrete, and small footings. A lot of them fail within a year or so of going in.

The worst one we've replaced cost its owners about $30,000 once the removal and disposal of the failed wall was included.

Why walls fail

We do. Removing and disposing of the old wall is part of the quote.

Yes. Fence brackets fix to the wall's steel posts and the fence stands on those. The brackets go on before the top two sleepers, so tell us when you ask for the quote, not once the wall is up.

We fit the brackets as part of the wall. The fence itself is a fencer's job, and we can put you in touch with one we trust.

Fence brackets, in order

30 people have written about what it was like, and they all write about the same things.

The thing people tell us most is that they can’t believe it’s only the two of us. After that, it’s how fast Jake works, how clean he leaves the site, and the quality of the wall.

Reviews published on Google. Names as the reviewers gave them.

Why people trust us with this

Taking out a wall that’s failed and building it again with the footings and drainage it was missing. It’s what we’re known for.

What we're known for

Knock down and rebuild is most of our work, and it's the job people ask us for by name.

The old wall leaves with us

Jake knocks it down and takes it away, then sets out the new one and starts digging pier holes, usually all on the first day.

We replace, we don't patch

Once we alter a wall another contractor built, we may become responsible for work we didn't build. So we quote it as a rebuild.

Built with what the first one was missing

Piers drilled with the right auger for the job, 450 mm on some walls and 300 mm on others, then 32 MPa plant concrete, steel reinforced sleepers, geofabric, a 100 mm socked ag pipe and 20 mm drainage gravel.

QBCC licence 15049372 (Jacob Spriggs)

Next

Tell us about the block

Six short questions, about two minutes. Brittany calls you back, then Jake comes out and measures the wall. Quotes are locked for 30 days, and the price only changes if you ask for extra work and approve it first.

A long timber look concrete sleeper wall with steps, running along a slope

Talk to us about your wall

Six short questions, about two minutes. Your details come first, so if anything cuts out halfway we can still call you back.

Step 1 of 6 / You

Your name and number are saved when you press Next, so we can call you back if you don't finish. Sending this agrees to our privacy policy, including the overseas handling it describes.

*Mandatory field

Speak to us0488 844 741Talk to us